BHP010 ENERJISA – BANDIRMA HEPP PROJECT
Client : EnerjiSA Enerji Uretim A.S. - TURKEY
Project Name   : ENERJISA – BANDIRMA HEPP PROJECT
Location : Bandırma, Balıkesir - TURKEY
Project Duration   13 Months
Expected Completion   June 2014
Peak Manpower : 120 people
Average Manpower : 80 people

AKON GRUP J.S.C is awarded the turnkey construction of Bandırma HEPP Project, in a consortium with Austrian market leader GEPPERT AG for Hydro Power Plants in the range of 2 to 10 MW.

The job consists of modifications to the existing cooling water discharge line from the 900MW Combined Cycle Power Plant in the area, and installing a new 3.5 MW hydro power turbine to recover the energy from the discharge line, before it reaches back to the sea. The project is designed as a green energy project and has got an innovation award within Sabancı group of companies.

Our scope consists of engineering, procurement and construction of the penstock lines, installation of turbine and construction of necessary civil works as required by design. We will also provide commissioning assistance and carry out electrical terminations within our scope.